《简单英文合同【优秀3篇】》
这次为您整理了简单英文合同【优秀3篇】,希望能够给予您一些参考与帮助。
简单英文合同 篇1
Contract No.:XXX
Sales and Purchase ContractFOR
Manganese Ore
This contract is made and entered into onXX, Feb 20xx under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/20xx revisi[]on) by and between:
The Buyer:
Address:
Tel:
The Seller :
Address:
Tel:
Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:
Article 1 Commodity
Concentrated manganese Ore
Article 2 Specifications
Concentrated Manganese Ore
Size: 0-5mm (90% min)
% Mn min.
% Fe max.
% Silica ( SiO2 ) max.
% Aluminum ( Al ) max.
% S max.
% P max.
Moisture max. 7%
Article 3 Quantity:
500 MT, partial shipment not allowed.
Article 4 Origin and Port of loading
Republic of ABC
Loading port:
Article 5 Packing/Delivery
In50 kg sack
Incontainer Shipment, more or less 20 tons.
Article 6 Shipment/Delivery
500MT(+/-5%)partial shipment not allowed
Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by seller’s bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confirmation of the delivery schedule.
The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.
Article 7 Contracted Price and Values
Price:Mn: 48% and above - Port, China
40% - - USD /%/DMTCFRCY Port, China
The Mn content will be average of the joint-inspection testing result at loading port.
Article 8 Payment
Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon presentation of shipping documents.
A. Seller’s Banking Details:
Bank Name :
Bank Address :
Account Name :
. CODE SWIFT :
B. Buyer’s bank issues L/C to the Seller's bank via . wire transfer.
Buyer’s Banking Details:
Bank Name : (will be advised)
Bank Address :
Account Name:
. Address SWIFT :
Article 10 Inspection of Analysis & Weight
The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand shall be done atloadingportby the above content shall be deducted from the total weight shipped.
Article 11 Documents
Seller shall present the following documents to the buyer:
A. Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.
B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.
C. Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.
D. Weight List, showing total weight , 1 original and 3 copies.
E. Bill of Lading, 3 original copies and 3 non-negotiable copies.
Article 12 Force Majeure
The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.
Article 13 Arbitration
All disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/20xx or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.
Buyer Seller
关于购货合同:
其中购货合同指的是企业作为需向供货厂商(供方)采购材料,按双方达成的协议,所签订的具有法律效力的书面文件,又称订购合同。
对于购货合同是指企业作为需向供货厂商(供方)采购材料,按双方达成的协议,所签订的具有法律效力的书面文件,又称订购合同。购货合同只有在合同条款不与企业所在地国家与地方实施的现行法律、法规和条例等相抵触,经合同有关双方相互承诺,并且合同各方在签订合同前没有欺骗对方的行为时才具有完全的法律效力。
简单英文合同 篇2
为了提高员工英文水平,北京xx公司(下称“公司”)聘请xx先生(下称“教师”)作为英文教师教授口语。经双方友好协商,达成以下聘任协议:
1、合同效力
本合同自双方签字后自动生效。
2、聘任期
六个月
3、课程安排
课程按以下计划安排
每周两次,每次90分钟。
每周课程具体时间是: 周一 ____:____
周四 ____:____
4、 双方责任
教师职责包括:
a) 根据参考书系统化,条理化教课。
b) 为提高英语听说能力推荐相应的磁带。
公司提供教室及第5条所规定的工资。
5、薪水
在聘任期内,公司在每月月底支付教师工资,每节课按240元人民币(税后)。
6、结束
合同到期后,无须通知任何一方,将自动终止。如其中任何一方欲延长合同,须在合同期满前2周通知对方。
invitation agreement
in order to improve the english level of the staff of _____ (hereinafter referred to as the “company^v^ as one part) invite mr. xx (hereinafter referred to as the ”teacher^v^ as the other party) to teach oral english courses. on the basis of friendly negotiation, both parties enter into this invitation agreement:
article 1 effectiveness of the agreement
the agreement shall come into force automatically as of the signature date of this agreement.
article 2 term of invitation
term of invitation shall be ____ .
article 3 schedule of courses
the courses shall be arranged with the following schedule,
2 courses per week, each course costs 90 minutes.
for each week, the courses is allocated to
monday ___: ___
thursday ___: ___
article 4 duties of the two parties
the teacher shall perform in a diligent manner, including:
a. formulate and provide a systematically teaching courses with reference books;
b. recommend tapes if they are conducive to improve listening and speaking english.
the company shall provide teaching room and pay salary to the teacher in accordance with article 5.
article 5 salary
during the term of invitation, the company shall pay the teacher an after tax salary at rmb _____ per course at the end of each teaching month (each 4 courses over).
article 6 termination
this agreement shall automatically terminate, without notice by either party to the other, when it expires. if one party wishes to extend this agreement, he shall notify the other party two weeks before the termination day of this agreement.
简单英文合同 篇3
party a:party b:
contract no
date:
signed at:
witnesses that the party a for considerations hereinafter named, contracts and agrees with the party b that party a will, within_____ days, next following the date hereof, build and finish a libarary building for party b. ( the building hereinafter is referred to as the said building.) the said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed.
in consideration of the foregoing, party b shall, for itself and its legal representatives, promise to pay party a the sum of one million rmb yuan in manner as follows, to wit:
rmb_____at the beginning of the said work.
rmb_____on _____/ _____/_____( for example: 3/21/XX)
rmb_____ on_____/ _____/_____
rmb_____ on_____/ _____/_____
rmb_____ on_____/ _____/_____
and the remaining sum will be paid upon the completion of the work.
it is further agreed that in order to be entitled to the said payments ( the first one excepted, which is otherwise secured ), party a or its legal representatives shall, according to the architect''s appraisement, have expended, in labor and material, the value of the payments already received by party a, on the building, at the time of payment.
for failure to accomplish the faithful performance of the agreement aforesaid, the party so failing agrees to forfeit and pay to the other_____rmb yuan as fixed and settled damages, within one month form the time so failing.
in witness whereof we have hereunto set our hands and seals the day and year first above written.
signed, sealed and delivered
in the presence of
party a : party b: